With our GHS-3/200 lifting system for NKT in Cologne, we are making a small contribution to the expansion of the German high-voltage corridor projects “South and Southeast Link”.

The special version of the lifting system has a capacity of 200 tons and is completely manufactured in an NKT-specific special version.

The equipment was completed with the 150 to SEFIRO heavy-duty transporter in a special version. The NKT internal cable drum logistics are now mainly implemented with Greiner equipment, our two products complement each other perfectly.

We are also supporting the energy transition, because the electrically powered SEFIRO is used for the German south-east and south cable routes, among other things.

envelopeprinterphone